Monday, 31 May 2021

Highly Political and Ideologically Driven - The Capita Contracts in Barnet

 It has been some time but Mr Reasonable is back! During lockdown and the incredibly tough time that we have all experienced, I thought I would ease back on my detailed scrutiny of Barnet Council and allow it to get on with what was a much more important job of looking after the residents of Barnet during this crisis. Throughout the entire lockdown period many vital frontline services have continued to operate and my thanks goes to all those incredibly brave and hardworking staff who have never had the option to work from home. However, council committee meetings have resumed in person so now is the time to resume detailed scrutiny.

Yesterday I reviewed the latest position on the Capita contracts in papers published for the Financial Performance and Contracts Committee which you can read here.  It sets out plans for which of the services currently operated by Capita will be brought back in-house, which will be reviewed after a year and which will continue to be operated by Capita after the contract expires in 2023.

In the past I would have taken my views and a long list of in-depth questions to the committee meeting in what would, in a normal democracy, be seen as public scrutiny. However, as we all know, in Barnet the current regime hate any form of scrutiny so they have gagged all those people who take a close interest in how the council is run.  I am allowed just one question on the contracts costing an average of £72 million a year. 

To set the Capita contract in context, set out below is the total Barnet have paid to Capita since the contract started in September 2013. As you can see, so far Barnet have paid Capita £540 million, £212 million more than was originally contracted.


When I meet people who are unfamiliar with Capita’s role in Barnet, they often ask if I am joking when I say that one council, Barnet, has paid over half a billion pounds to one company, Capita. The level of disbelief is huge but that is the reality of the contract councillors entered with Capita back in 2013.

The paper being discussed next week sets out where they have got to in reviewing the two contracts and the strategy going forward, something they are asking councillors on the committee to agree. Bear in mind that the CSG contract review should have been completed two years ago and the Re contract a year ago. It is accompanied by a “Market Insights” report prepared by Grant Thornton in which the Executive Summary opens with the statement:

“Historically procurement has been ideologically driven and highly political”

Definitely 100% true in Barnet’s case. It also goes on to say:

“The gap between cost and efficiency for delivery between the public and private sector has been significantly squeezed over the last decade as a result of market pressures. This means that outsourcing is not always the most cost effective option by default”

Unpicking that statement and reading between the lines, it is saying that the price difference between companies like Capita and in house teams is slim, if at all, something I told Barnet back in 2012 and 2013.

The killer line is at the bottom of the executive summary where it says:

Key to pragmatic delivery and understanding is an effective and objective options appraisal process with a clear vison at the outset of 

‘WHAT ARE WE TRYING TO ACHIEVE’ and 

'WHAT PROBLEMS ARE WE TRYING TO SOLVE’

The council failed to address those two critical questions in 2013 and reading the committee paper they still have not been addressed nearly eight years later. Indeed the current paper seems to have been written from a Capita centric view point with services from which Capita can continue to make money being retained and those that do not generate profit/make a loss, or don’t fit the model of what Capita want to provide, being returned to Barnet. 

For example, the reports says it makes sense for Capita to keep IT, customer service and revenue and benefits. All three of these services have contract clauses that allow Capita to charge extra for exceeding volume thresholds. The biggest money spinner of all is planning, a service which is intrinsically linked to local knowledge but which Barnet seem happy to let Capita keep creaming off a profit share. I am aware that there has been a high turnover of staff in the planning department and this has led to a real loss of local knowledge when planning applications are put forward. Knowing planning law may be seen as the most important criteria but I would say that having some local knowledge, is right up there when deciding planning applications. One possible reason for the high turnover of staff is that the biggest employer of planning officers are other local authorities who offer the benefits package, especially pensions, that Capita fail to offer.

Set out below is a summary of how the different services will be managed; retain means retained by Capita and returned means given back to Barnet to manage. I have dealt with the issues involved with each service individually below the table.



IT – “whoever controls the data controls the world” applies at corporate level as well. Without control of the IT systems we are forever dependent on Capita. A couple of years ago when there was a major review of spending being carried out, some of the shortcomings of Capita’s Integra system were highlighted, especially budgeting for capital project over more than one year. The then acting Finance Officer (who I rated highly) said that computer systems such as SAP had the ability to schedule capital budget over many years and he has used that at other Local Authorities. The irony of the situation is that Barnet had spent more than £20 million developing and perfecting an SAP system only for it to be thrown out and replaced by Capita’s Integra system when we signed the contract back in 2013. In this paper they have recognised the need to improve of the Integra systems and are saying that by extending the contract, Capita will make investment in this area. 

WARNING!!! 

This is a complete and utter myth. Back in 2013 Barnet councillors said they did not have the money to invest in IT systems and that is why they needed a company like Capita who would invest their own money in new systems. However, as soon as the contract was signed they completely reversed that decision saying that it was much cheaper for the council to borrow money than Capita and put up £16.1 million which they said saved the council £800,000 in interest that Capita would have charged. The same will happen again this time.

Customer Services – The report says that this service has performed well. Not what Barnet residents were saying pre covid when getting through to the council on the phone system was a nightmare. I demonstrated that on some departments Capita had never met their full quarter KPI targets on answering the phone since the start of the contract. 



Barnet’s response was clear and decisive…. they stopped publishing the data so that I could not point out the failings any more. Capita also charge extra when call volumes exceed target levels, even though many of the calls are now fully automated (quarter of a million pounds in 2018). The Covid pandemic has seen a massive change in the way calls are handled with call centres closed and most calls dealt with by staff from their homes. Why haven’t Barnet looked at doing this themselves?  Covid has forced many people in the hospitality and retail sectors out of work In addition, there are always people looking for fairly paid part time work, especially working mothers who need to balance childcare with work. Why aren’t Barnet looking at utilising these local staff working from home as a way to create better paid local jobs using people with good local knowledge. Sadly this is a prime example of ideology trumping pragmatism.

Revenues & Benefits – This service is now the largest recipient of the wonderfully titled “Gainshare” clause. With this clause, if Capita save some money or gather more than was forecast 9 years ago when the contract was drafted, then they get to keep a proportion of it – up to 50%.  Last year Capita claimed £837,218.66 using this clause including £180,421.92 gainshare for exceeding the council tax collection target,  £125,057.81 for gainshare on recovered housing benefit over-payments and £230,702.89 for reducing the number of people claiming single person discounts. Times and technology have moved on. It would be good to see Barnet hanging on to all of that £837,000 rather than handing it over to Capita.

Procurement – after years of campaigning and highlighting to both Barnet Council senior officers and to the External Auditor how much we were paying out unfairly in gainshare to Capita on procurement, gainshare on procurement was dropped as part of a secret deal done between Jonathan Lewis, CEO of Capita, and Barnet back in November 2018. This clause had generated just under £8 million of gainshare for Capita so was extremely lucrative. Without it Capita simply can’t be bothered so that is why they are handing this service back to Barnet.

Accounts Payable/Integra – Barnet are proposing that this service is given a short extension with a further review even though Accounts Payable has been one of the worst performing services of those provided by Capita. Since the start of the contract Accounts Payable has received four limited assurance reports from Barnet’s Internal Auditors in January 2015, January 2016, April 2018 and October 2019. This department’s failures were also highlighted by Grant Thornton in their investigation into the £2m fraud discovered in 2018. What else is to review – they have provided consistently lousy service and should have been sacked back in 2018. The report also talks about economies of scale but this is already a massive operation. In 2020/21 I logged and tracked 162,468 payment transactions and those were only the ones made public. Accounts Payable needs attention and is large enough to warrant being brought back in house where hopefully we would get more scrutiny on what is being paid out.

HR/Core HR - a large part of this service has already been brought back because of serious failings. It therefore makes sense to bring the rest back when the contract expires yet Barnet want to extend and review this service. Why? Ideology over pragmatism.

Estates – another service earmarked a short extension and further review. Reading the report it is hard to understand why when it says “Overall, the Estates function has had a number of problems over many years, which go back to before the CSG contract was put in place. Repeated efforts to resolve this over the years have made some improvements, but the service is not yet consistently performing to the required standard”.   The only conclusion I can come to is that Capita want to hang on to it because while they provide a dismal service, they can still claim gainshare on property income where Capita keep 30% of the additional income from rent reviews, lease renewals and letting on the property portfolio above an agreed baseline. Last year that was just over £100,000. Are you starting to see a pattern here?

Planning Control & Development – Barnet is in the top ten of busiest planning departments in England (2,694 applications in 2020), something from which it generates a large revenue stream. The head of planning was a Barnet council staff member before the contract was outsourced so I am not sure what value Capita have brought to this contract but currently we have to share the planning income with Capita. Given that there has been so much criticism of planning and the accusation of conflicts of interest with other Capita companies such as GL Hearn, it would seem like an obvious choice to bring back in house. In this case the financial interests of Capita win again.

Building Control and Land Charges – again both revenue generating service where profit has to be shared with Capita so yet again the recommendation is to leave the service with Capita.

Regulatory Services - these include Environmental Health, Trading Standards and Licensing and they are recommended to return to Barnet’s control. Definitely, the right decision and one where right back in 2013 it seemed unwise to hand to a contractor. Possibly of more relevance is that none of these services make money so are therefore of no interest to Capita.

Regeneration – is also a strategic service which generates no income for Capita so surprise, surprise the recommendation is that it should return to Barnet. It is important that the service is run and controlled by Barnet staff but it is clear to see why Capita aren’t putting up a fight to keep it.

Highways – this is another service that has performed dismally under Capita. They have struggled to recruit and retain senior management for this service. It received a 'Limited Assurance' rating in April 2017 and a 'No Assurance' rating, the worst possible, in October 2019. Indeed at the most recent Audit Committee meeting in April this year, the deadline for resolving the problems identified in the 2019 report had been missed again – for the 5th time. Capita do not physically carry out the highways work; that is let through a London Councils framework contract, they just manage it. The report is also contradictory on this service saying in the text that the service should be returned yet in the chart saying it should be extended with a further review. Which is it?

Cemetery & Crematorium – the report says that Capita aren’t doing a bad job. Others who had a loved one’s memorial bench chucked into a heap in the Hendon Cemetery memorial garden and who have seen the process of death “memorialised” to use Capita’s jargon, might disagree. However the service doesn’t fit with Capita’s strategy “and is the only cemetery and crematorium they (Capita) run. Whilst this does not present any immediate issues of concern, the potential for them to add further value to the development of the service over the medium-term may be limited”. So yet again they are handing back a service not because of any pragmatic or logical reasoning but because it doesn’t fit with what Capita want to provide.

Reading this report I am shocked that it is so one sided and biased towards what is best for Capita rather than what is best for Barnet and its residents.

The Grant Thornton Market Insights report raises a number of interesting points including information about councils that are insourcing (bringing back in house) services that were previously outsourced.

As I mentioned at the outset, local residents are not allowed to ask more than one question and if more than two residents want to ask their single question about an agenda item then they are simply ignored. We will be invited to a focus group session in early July and one later in the year in the same format as 2018. In that focus group they gave everyone tea and biscuits and £50, (I donated my fee to charity) listened to what everyone said and then completely ignored every single word. It ticks the box for consultation without listening to a word that is said.

This is a contract which has already cost £540 million yet this report seems superficial and entirely biased in favour of Capita. Grant Thornton are right when the say procurement has been ideologically driven and highly political. Unfortunately that seems to still be the case in Barnet. No big picture, no wholistic viewpoint, no recognition of the links between services that make a council function efficiently, just more of the same old fashioned ideology where Capita’s needs and strategy are at the forefront of any decision.

Thursday, 30 July 2020

It's been a while - but I'm still here

I have been continuing to keep an eye on Barnet's finances during this very difficult time but as lockdown eases I thought to was a good time to start digging a bit deeper into Barnet's finances again, especially as the annual inspection of the accounts is coming up in August.

In terms of the monthly supplier payments it looks like Capita continue to benefit from their contract with Barnet. In June they were paid £12.5 million and this brings the total paid to Capita on the Barnet contract to a whisker under £500 million. When I mention this figure to some people they laugh as they simply don't believe that one council could pay so much money to one company but that is the reality of Capita in Barnet. The table below gives you the detail.
















The long overdue review of the two Capita contracts has been postponed because of the Covid crisis but from my perspective it now looks inevitable that the contracts will be extended for a further 5 years taking us up to 2028. Capita may lose certain components of the contracts along the way but that may well suit Capita especially those elements which make them little or no money for them.

Interim and agency staff are still in great demand with another £1.26m spent in June. In some ways there is a plausible reason for having so many agency staff when many staff may have been absent due to Covid but it still seems like a lot of people employed on a temporary basis.


A couple of other things have jumped out of the latest supplier payments. The first is a payment of £375,823 to PA Consulting. Now I may be wrong but I believe they have been commissioned to sort out the mess of the Mosaic casework IT system which Capita tried and failed to implement. Barnet did receive a settlement from Capita on this project but increasingly this looks like is was way too small.

The other payment is to a company called Wirecard. Since the start of the financial year in April, Barnet have paid £239,340 onto these cards which is used for pre-payments. The problem is that Wirecard ran into financial difficulties in June with a €1.9 billion blackhole in their accounts. The background can be read in the Financial Times here and then in the Barnet Times here where Barnet Council played down the seriousness of the matter. However, a number of people had their payment cards suspended until the insolvency administrators took over. It demonstrates quite well why we have to be vigilant at all times and that just because a company is large and well known it does not mean it cannot go bust.

I will keep watching Barnet's spending.

Friday, 3 January 2020

Are agency staff costs out of control in Barnet?

For years I have been raising concerns about Barnet Council spending on agency staff. From a peak of just under £20 million a year in 2016/17 it has been declining and at the current rate should hit around £14.5 million by the year end.

However, I also review the monthly agency spend by department and what I have seen it a rising trend for agency spend in the Streetscene department which includes the refuse collection department. I have yet to see any evidence that the massive round reorganisation that took place in November 2018 has generated a single penny of savings and at the same time I have seen the agency spend continue to rise. Back in June I raised concerns that Streetscene was spending on average £50,000 a week on agency staff but in October that had risen much further and in November we saw two weeks where the agency spend was over £80,000 per week. So what this suggests is that while spend in some departments is falling, any savings are being offset by increases in the Streetscene department and I suspect this is to bolster the disastrous refuse collection changes. The agency spend did decline at the end of the month but that is a reflection of the fact that the green bin collections were paused early (10 November) because of the subsidence problems at the new Oakleigh Road waste depot. Public scrutiny has been gagged in Barnet and as such these trends are simply ignore at committee meetings and I get the impression that most councillors never actually drill down onto the figures.

Capita spend was comparatively low in November because there were no quarterly payments made this month but the running total for the contract to date is still £166.5 million more than was contracted.

2020 should see the 6/7 year review of the two Capita contracts but I have no confidence that they will examine what has been going on and whether Barnet residents are actually getting a good value service. I will keep watching how Barnet are spending our money.

Friday, 25 October 2019

Supplier Payments for September - a Bumper Month for Capita

Barnet Council may think that by gagging me it has stopped me from scrutinising what they do but trust me, that is not happening. The September supplier payments are out and yet again it has been a bumper month for Capita being paid £7.78 million on the CSG contract and £3 million of the Re contract.

Set out below is the running tab for Capita which has now hit just a fraction under £438 million since the contract started and £165.6 million more than the contract value.


Agency staff costs are settling down to £1m per month but there does seem to be some discrepancy between figures publish on different parts of the council website.


There were large payments to The Barnet Group and John Graham Construction who are building the two new leisure centres in Barnet.

In the next week I will be blogging the questions I would have put to the Financial Performance & Contracts Committee and the Audit Committee had I not been gagged by Barnet Tories.

Sunday, 10 March 2019

Questions for the Financial Performance & Contracts Committee

How would feel knowing that the outsourced company responsible for managing Highways repairs and maintenance has 25% of posts vacant and are struggling to recruit? Is that why the highways in Barnet are so poor?  We still don't have clarity on agency staff costs and appears to have some very expensive interim staff on six figure salaries. The Council's relocation to the brand new office block in Colindale is late and they are in dispute with the contractor over costs. How much will this new building cost and how easy will it be to get to the new offices if you live in the East of the borough? Just some of the topics on which I have asked questions. As ever, I will have to wait and see if I get straight and direct answers to my questions.

  1. 1.2 says that a £3.685m contribution to reserves from the Capita contract settlement. What happened to the other £0.435 million that formed part of the settlement, when was it paid and where is the record of the payment given that it is not shown as a credit in the monthly expenditure figures?  
  2. What was the reason for the underspend of the forecast NLWA levy?
  3. At 1.9 the report states that the average interest rate for the £304.08m of long term debt is 3.86%. How much of the long term debt is in Lender Option Borrower Option (LOBO) loans, what is the interest rate on those LOBO’s and what steps have been taken to follow in Birmingham and other authorities’ footsteps to extricate themselves from LOBO’s and replace them with lower cost PWLB funding at a lower cost?
  4. Re para 2.1.10, please can you explain in more detail why there is presently a backlog in raising invoices for income due to the service and why CSG is a significant debtor which could result in debt write offs being written back to the service?
  5. How much of the £293,000 overspend in HR is due to the high cost of interim agency staff in senior positions and please can you clarify how many agency/interim staff in HR are costing the council more than £100,000 per annum?
  6. Re para 2.1.20 please can you clarify on which specific retained income lines the £1.346m shortfall has occurred?
  7. Can you clarify specifically how the housing benefit overpayments occurred in the first place, are the repayments anticipated or actual, and will the gainshare be paid before or after the repayments have been recouped?
  8. When you say that the misclassification of income between the General Fund and the HRA has been resolved in 2019/20 and going forward, does this mean that the authority will receive this income going forward or that the income has been reclassified so that we definitely know we won’t receive the income?
  9. Can you clarify how you can reconcile Table 2 which shows an overspend on Streetscene of £1.147 million with Table 6 that shows Environment are still on budget to save £1.915 million and does this mean that additional cuts will have to be made from elsewhere in Environment to make up for the overspend on Streetscene?
  10. Given that a significant debtor is Hammerson PLC owing over £1 million, that all of the invoices required more information and that two of these invoices are more  than a year overdue, has all the requested information been provided and what steps will be taken to seek immediate payment?
  11. Given that Barratt have failed to respond on 8 out of 10 invoices with a value of £600,000 what steps are you taking to recover this money immediately?
  12. Why do the agency staff cost figures not tie into the actual staff cost invoices even taking into account when the invoices were paid?
  13. Why does the average cost of employing agency staff vary by so much from month to month especially in Commissioning Group given there is so very little difference in the number of FTE staff employed?
  14. Given that the agency costs do not include interim and agency staff employed outside Matrix contract, can you quantify what the additional spend is through agencies such as Hampton’s Resourcing and Gatenby Sanderson, and what is the headcount for those agencies?
  15. At point 1.11 it lists 8 areas where benefits were built into the new contract. Can you clarify why those benefits were not build into the Comensura contract either from the start or when a new contract was awarded to Comensura in 2016?
  16. How much do you believe these 8 benefits built into the new contract will save Barnet per annum?
  17. The report fails to identify why recruitment and retention is a problem. What has Re done to understand the causes of the problem, for example have Re undertaken Barnet staff satisfaction surveys, how many exit interviews have been carried out and what were the findings, is it a morale problem, is it a pay and benefits problem? Without knowing what is the cause of the problem how can any mitigation proposals have any chance of success?
  18. Will the lower salary and pension costs arising from so many vacancies be reflected in lower charges made by Re to Barnet?
  19. At 1.35 the report states “Capita has not hit the targets for satisfaction, but there have been incremental improvements in most areas”. However, the report identifies that in 7 out of 10 satisfaction criteria the performance/direction of travel has actually worsened since last year. As such how can the statement “incremental improvements in most areas” be true?
  20. Given that none of the satisfaction KPIs have been met since contract commencement 5 years ago can you please explain what is the point of having KPI’s and what signal does this send to Capita about prolonged non compliance?
  21. Seven different bus routes stop in close proximity to Barnet House and the Northern Line stop at Totteridge & Whetstone 5 minute’s walk from Barnet House make it very accessible to residents. How accessible will the new offices at Colindale be to residents in the East of the borough who have housing queries or want to inspect a planning application in person?
  22. After June 2020 where will the family services in the be located in the East of the Borough and what reassurances can you give that funding for a permanent East Hub will be allocated?
  23. Given that last week I was told that an exit from the Barnet House lease had not yet been agreed, why wasn’t this identified as a risk in the report at section 1.16.7 and what is the scale of the financial risk – i.e. how many months will we have to keep paying rent for Barnet House once it has been vacated?
  24. What is the scale of the financial risk of not being able to vacate NLBP4 by June 2019?
  25. Have you carried out any staff surveys to understand how many staff feel about the move to Colindale, how many staff will find the move difficult in terms of travelling/commuting and what estimates have been made on change in staff retention as a result of the move?
  26. Please can you clarify when (i.e. June 2019) you will have certainty on the scale of the financial risk of the contractual dispute with the building contractor so that it can be incorporated into the budget?


Tuesday, 26 June 2018

Financial Performance in Barnet - Some very serious questions

Next Monday is the first meeting of the newly restructured Financial Performance and Contracts Committee. You can view the committee papers here but I warn you they are a long read. This committee last met on 27 February, 4 weeks before year end. At that point no significant mention was made of the poor financial performance. Four months is far too long to wait for a committee dealing with such important matters. Maybe it was because Barnet or Capita were too ashamed of the results.

CSG run by Capita had a dismal performance including failing 18 contract indicators. But not to worry. The footnote makes it clear that although they had all these failures, none of them count as a contract failure so that's Capita off the hook. I absolutely despair of Barnet's ability to enforce performance on these contracts.
Capita run Re also turned in an appalling financial performance. At the committee meeting on 27 February they showed a net overspend of £285,000. By financial year end, 4 weeks later that had increased to £6.7 million. Someone somewhere was not doing their job to have such a massive change in financial performance in the last 4 weeks of the financial year. I would also draw your attention as to how they change the format between reports to make comparison a bit more confusing.


Of critical importance at this meeting is the dire financial situation and what it means for Barnet residents. This financial year Barnet has to make an additional £9.5 million of savings. That is on top of the £9.9 million of savings they have already budgeted (but may fail to achieve). What is worse is that while the reports detail the failings there is no clear indication of how these problems will be resolved. The reports also uses positive narrative and spin to make the situation less serious than it really is, a worrying approach if councillors aren't super vigilant in interpreting what they are being told. Last year Barnet had to use £21 million from reserves and balances to fund the overspend, a situation which is entirely unsustainable but I see no prospect of how they are going to close the  budget gap this year.

Set out below are questions I have submitted to the committee. As always I have low expectations of whether they will be adequately answered. I will update you after the meeting.

  1. On 27 February 4 weeks before year end this committee was made aware of an overspend after adjustments from reserves of £4.232 million. In 4 weeks that overspend almost doubled to £7.885 million. Why was there such a serious under reporting of the financial position at the last meeting?
  2. Given that this committee was not alerted to the scale of the  financial overspends at the 27 February meeting, 4 weeks before year end, and only discovered in May when the year-end accounts were being closed, how confident are you that this report provides you with an accurate picture of current financial performance?
  3. Do you think that the net draw on reserves and balances for 2017/18 of £21.148m is either acceptable or sustainable and what steps are you going to take to ensure this huge draw on reserves and balances does not occur again this year.
  4. 1.2.3 implies that the Policy and Resources committee were aware and approved of all the drawdown on reserves and balances which they were not at their meeting on 13 February, 6 weeks before year end. Do you think the wording of this section should be changed to reflect the fact that such a large shortfall was only identified after year end accounts were closed.
  5. In the report it states that the overspend was reduced following drawdown from reserves. This is entirely misleading as the overspend was not reduced. Should the report be corrected to say the overspend was offset following drawdown from reserves as that is a more accurate description of the situation.
  6. At this meeting in February most of the budget overspends were identified with one significant exception which is the Re budget. In February the Re budget outturn was forecast at £611,000 with reserve movements of £241,000. On that basis paragraph 1.2.18 entirely misrepresents the situation by saying that the budget was overspent by £3.954 million. Can you confirm that the budget was overspent by £6.7 million of which only £290,000 was identified at 27 February.
  7. Of the two overspend items in the Re budget, is the £4.5 million guaranteed income the same element that was identified by the external auditor last year and on which the Audit committee were given solid reassurances by the Director of Resources that they would be recovered?
  8. Will you be asking the Director of Resources why they gave such a reassurance last year that has failed to materialise?
  9. Please can you explain why it took from July last year until after year end before this committee were made aware that this amount was not recoverable?
  10. Please can you clarify specifically what you mean by the sum being “accounted for within the HRA budget” given that this sum is not reflected in the HRA budget outturn at Table 3?
  11. Can you clarify specifically what the legal advice said as to why the “guaranteed income” should not be included in the General Fund revenue account?
  12. If the other major Re overspend of £2.647 million was a contractual liability, why was it not recognised in the performance figures sooner so that other budgets could be adjusted before year end to reflect the liability?
  13. At 1.2.23 the report states that “net pressure” is £9.5 million. Can you confirm that this is in addition to the planned savings already forecast of  £9.932 million meaning that total savings required this year are £19.432 million?
  14. Given that we are three months into this financial year what is the latest update on the realisation of this £19.432 million of savings?
  15. How confident are you that the narrative in this report is balanced and that it provides a true picture of performance?
  16. At 1.6 in the report it states that six performance indicators were not met yet at  1.7 the report states that Cambridge Education only failed to meet one contract indicator. Does that mean that the commissioning and corporate plan indicators are not the contractual responsibility of Cambridge Education?
  17. The report identifies indicators not met but no reassurance is provided as to how they will be met in the future. How can we be sure that these indicators will have been met when they are next reviewed?
  18. At 1.8 no mention is made of the massive financial fraud that took place last year and which it appears was able to take place as a result of failing in the internal financial controls which are the responsibility of CSG. Can you tell me why this was not included in the report?
  19. The report states that “a review of internal financial controls was undertaken and improvement implemented”. Is this the Grant Thornton Project Rose study, and if so when were these improvements implemented and will the report either be made public or circulated to members of this committee in private session/ “blue papers”.
  20. The report notes that a gainshare working group was set up to review the application and reporting of procurement gainshare. Please can you provide me with more details as follows: what are their terms of reference; who attends the working group; how many times have they met so far; do they publish minutes; what is the timescale for producing a defined output; do Capita attend these meetings; will you be taking public evidence; and will the findings be made public?
  21. How confident are you that the gainshare savings stated are real and specifically as a result of Capita expertise or could they have been achieved using standard framework contracts available to local authorities?
  22. When I checked on the 23 May 2018, the contracts register for 2018/19 was on line and showed  that 112 contracts had expired before the start of the 2018/19 financial year. On 23 June 2018 the data set had been removed from the Barnet Open data portal. What is going on, it the contract register being maintained up to date, how many contracts are currently being used that have expired?
  23. For 2017/18 I understood that the in-year Council Tax and NNDR collection rate were guaranteed at 98.0%. On that basis why is the in-year council tax collection rate shown as only 96.02%  and only 96.89%  for NNDR and will CSG be making up the shortfall?
  24. There are a large number of KPI’s not being met or performance is worsening yet the report does not appear to identify what steps are being taken to ensure they situation improves. How can we have any confidence that these matters are being adequately addressed and that this time next year the situation will have improved?
  25. Do you think it would be helpful to inform committee members that the caseload charges over and above the core fee for 2017/18 were £190,953 and that CSG customer service volume excess charges were £247,000?
  26. Given that the council has now introduced monthly financial reporting can you include in the terms of reference that the quarterly financial reports must reflect a rolling quarter’s data i.e. the three months figures immediately prior to the committee meeting as a way on ensuring you get the most timely and accurate information.
  27. When the report says the CFO’s report will give a “broad look” at financial performance it creates ambiguity and risks failing to provide you with important detailed information.  Given the content of the report are listed do you agree that the term “broad look” should be deleted and include the words “and any other information the committee deems important for the monitoring of financial performance”?
  28. Do you think it would be advisable to add in the following phase: “The report must be provided in a consistent format which not only allows immediate transparency but facilitates the easy identification of trends in performance over a period of time”?
  29. Will this report include details of the Budget Recovery Plan, progress on non-essential discretionary spend controls and any SPIRs that have been frozen?
  30. Will the report give details of the Capita contract negotiations – even if they are provided in private session/within confidential “blue” papers?
  31. Given that staffing and agency costs are a major source of budget overspends surely this committee should receive details of  staffing, incl. headcount, FTE, agency and sickness absence as these are financial performance issues not policy issues?
  32. For the avoidance of doubt, who is the Chief Finance Officer as there is no such post in the LBB senior management structure; are they a Capita employee, the Head of Finance or the Director of Resources/S151 Officer.
  33. Will the S151 Officer attend these meetings?
  34. Why are we waiting until September to get a report on agency spend when it represents such a major cost to the council given that we will be half way through the financial year at that stage and have less opportunity to act on the findings before year end?

Monday, 25 June 2018

Barnet Food Waste Collections – a dirty business - A joint blog by Mr Mustard & Mr Reasonable

UPDATE FROM THE MAYOR OF LONDON

"The London Environment Strategy and the policies and proposals on waste and recycling have been developed following an unprecedented process of evidence gathering, analysis, stakeholder consultation and dialogue. Barnet did not respond during the public consultation on the issue of food waste collection, which was included in the waste policies and proposals.  The waste policies represent a trajectory that is the best environmental and economic solution for the city and at the borough level. Londoners too expect and deserve a consistency of service provision across the city. The evidence points to the impacts that food waste collection has on driving higher rates of recycling across the board I am concerned about the impact on recycling performance from Barnet’s decision to stop separate household food collections. I do possess, through the GLA Act, the backstop power to direct authorities, where I consider it necessary for the purposes of implementing the municipal waste provisions of the London Environment Strategy.  Moreover, waste authorities have a duty under that Act to undertake their waste responsibilities in such a way as to be in general conformity with the strategy. However, the use of my power of direction is clearly an option of last resort, once all other avenues have been explored and exhausted.

On the 19th of June, I wrote to the Leader of Barnet Council expressing my deep concern at their decision and requesting that it is put on hold. This will enable my officers to now start the process required of us under the GLA Act.   See also answer to Mayor’s Question 2018/1583".

As is the way in Barnet, nothing is ever quite as it seems. On 5 June, just four weeks after the local elections, Barnet Conservatives voted to scrap the separate brown bin food waste collections on the basis that it would save £300,000 a year. A minor concession was suggested by Cllr Peter Zinkin that officers should identify how those residents who wish to continue to recycle their food waste could do so but with the rider that it should be at no extra cost to the council.

Both Mr M & Mr R thought this was a poor and illogical decision and decided to investigate further.
With follow up questions to the Director of Street Scene, the basis of the £300,000 saving was identified as follows:

“There are 12 front line blue bin and food collection rounds. Each of these round has one loader dedicated to collecting food waste, and two loaders to collect recycling. Stopping food collections will mean that 12 loaders will not be need for this purpose. The mid point cost of a loader including on costs for 2018/19 is £26,906. As such the savings on 12 loaders was calculated to be £322,870. The increase in disposal costs for food waste being transfer into the brown bin was £22,300.  We are not going to make staff  redundant those loaders who are no longer collecting food waste will instead be used as a pool of staff to fill in for staff on leave etc. rather than them being replaced by agency staff. This will reduce the recycling and waste agency spend”.

The key figure here is the increased disposal cost of food waste incineration which is quoted as £22,300. Now one thing Barnet Council fail to grasp is that Barnet Bloggers double check everything.

We had discussions with: 
  • the company that currently carries out the anaerobic digestion of Barnet’s food waste;
  • three other anaerobic digestion companies in North and East London;
  • London Energy (the company that runs the waste incinerator); and
  • the North London Waste Authority (NLWA) who manage all waste disposal for seven North London Boroughs including Barnet;

and a different  picture emerged.

According to many sources, food sent to anaerobic digestion has a much lower cost compared to being sent for incineration. NWLA confirmed what is termed “gate fees”, the charge for disposing of waste as follows: Waste sent for incineration £89.47 per tonne, food waste sent for anaerobic digestion £31.39 per tonne, a difference of £58.08 per tonne.

Barnet currently sends 5,000 tonnes of food waste annually to anaerobic digestion, so the increased cost of sending food waste for incineration is not £22,300 but in fact £290,400. On that basis removing brown bin collections will not save £300,000 per annum, it will instead save £32,470. What is worse is that as the borough grows and more food waste is incinerated, that modest saving could be eroded to a point where there is no saving at all.

So coming back to Cllr Zinkin’s offer, it is possible to recycle everyone’s food waste at a very modest cost compared to what officers are proposing, just £32,470 or around 23p per household per year. We think it’s worth it.

Mr Mustard & Mr Reasonable

Sunday, 3 June 2018

April Supplier Payments - Good job someone reads these spreadsheets

As you may know I keep a running track of supplier payments each month. April's figures were published last Wednesday but reading through them it was quite clear there was a problem.  First of all there was £8 million of redacted payments classified as personal data. This is many time more than would usually be seen. In addition there were no payments to Comensura. which are typically between £1.3 and £1.8 million.

I asked for Capita to go back and check the data and on Friday they republished the list. Redacted payments fell from £8 million to £2 million, Comensura payment were £1.4 million  plus a range of other payments adding up to a further £4.6 million. Interestingly there was a payment of  £225,394 to London Borough of Harrow for fuel. This is because Barnet share Harrow's depot for some of the refuse vehicles and have to buy their fuel via Harrow. Are we getting the best deal - who knows but because Barnet messed up the Oakleigh Road depot, which is too small, we have no alternative.

Capita had no substantial payments this month but Re had a payment of £2.9 million, surprising given that they received an advance payment of £16 million last year - that must have run out.

I do wish someone would check these payments before they are published rather than leave it to the public to tell them they have got it wrong.


Saturday, 12 May 2018

Lots more senior staff in Barnet plus some big pay rises

I like to keep an eye on Barnet senior salaries which are published on a monthly basis; you can read them here. The list looked longer than I was expecting so I investigated a bit further.

Last August a number of staff got some very large pay rises so I compared the May 2018 senior salaries list to the same list from December 2017.

A few things that I identified:
  • 21 new post (excluding one temporary post covering maternity leave);
  • 6 posts removed so a net increase of 15 new posts;
  • a net additional cost of  £1.1 million per annum;
  • 8 staff received pay rises ranging from a rather modest £1,189 to a very sizeable £12,500 with the majority of rises £8,000 per annum;
  • 1 staff member did get promoted to a new role and got a £21,000 pay rise.
With so much talk about cuts to services it does seem rather strange so many new posts have been created and such substantial pay rises have been pushed through. In terms of the new posts I suspect that part of this increase is merely a reflection of the reduction in interim and agency staff whereby interim staff are being taken off agency status and taken on as full time staff due the tightening up of tax rules for the self employed by HMRC.

In terms of the pay rises, last time I raised this with Richard Cornelius he said it was necessary to stop staff from leaving. Maybe the Council should look a little deeper as to why staff want to leave?



Friday, 20 April 2018

Enough is Enough - Time to Sack Capita

Between the two contracts, CSG and Re, we have paid Capita £327 million. Let that sink in for a minute; £327 million to a private company from just one London Borough. Ever since the contract was proposed I have challenged how such a pervasive outsourcing programme can work in the best interests of Barnet residents.

I have always made it clear that, ideologically, I have no problem with outsourcing so long as it is being done for the right reasons. Typically this is where it involves very specialist, non core activities where technical expertise may be difficult to secure and retain in house. In Barnet's case this outsourcing programme covered so many services which were core to the running of the council and which in 2010 were rated as 4 star (good). Barnet has been an experiment in mass outsourcing and almost five years in, it appears to be a failure.

Last night's audit committee was a litany of service problems, system failures, lack of controls, under performance, a major fraud. Internal audit saying issues were a problem, Capita saying they weren't.

Councillor Khatri, the now independent councillor for Mill Hill, deselected by the Conservative group, gave a quiet and persuasive evisceration of the Capita contract. He has long been a sceptic of the Capita contract believing that it does not offer value money for residents. Cllr Khatri is no fool, with an MSc and 34 years government experience in Export Credits Guarantee Department he is a shrewd and analytical person with great experience of business.

Some people have said that this contract is too large to fail, too large to bring back in house, so we are stuck with it no matter how poorly it performs. Unsurprisingly, I have a different view.  I believe that with a properly planned programme, the service can be brought back in house efficiently and cost effectively. We have an opportunity to redesign the council to ensure that departments deliver excellent service. This will allow a large number of senior commissioning posts to be removed saving millions.

The first phase will require Finance, Pensions Administration, IT, HR and Procurement to be brought back in house. These are the key levers by which you can control the business. It provides you with the information you need to understand which parts of the business are performing well or badly. The next phase is to set up a call centre in Barnet to deal with customer enquiries and the revenue and benefits service. Staff 100 or 200 miles away working for a number of councils simply don't have the local knowledge required to quickly deal with problems.

In terms of the Re contract that is a joint venture between Barnet and Capita. It just doesn't seem to work  as was exemplified last night at the audit committee. The CEO of Barnet who is a board director of Re has failed to get Capita to agree to new KPI's to more effectively manage the Highways contract. This has been dragging on for a year and there is still no clear outcome. There is what I described as a contractual gordian knot with exceptionally complex contractual relationships between Barnet and the companies that actually deliver services. This means that contracts aren't being effectively monitored and managed. I have yet to see any real financial benefits of the Re relationship - they have failed to sell services to other councils. This is a contract that can be brought back in house very rapidly simply by dissolving the JV and transferring staff back into the council. It cuts out the middleman of Capita and the profit they extract from the arrangement.

It can be done and it should be done. It is time to part company with Capita and take control of how Barnet operates.


Monday, 16 April 2018

Questions to the Audit Committee

I have submitted the following questions to the forthcoming audit committee this Thursday. I hold out little hope of getting appropriate answers.


Agenda Item 7
  • At 1.3.1 the numbers do not seem to add up. Should it read 49 high priority actions (not 45)?
  • On accounts payable the report states that “Because these controls rely on data being entered correctly, they have historically not been very successful at automatically detecting duplicates”. Is the report implying that data is not being entered correctly?
  • The reports states that “CAFT have found that the high number of false duplicates identified make it uneconomical to investigate these transactions”. When did CAFT first identify the high number of false duplicates, why has this not been raised with the audit committee before this meeting given the Integra system has been in place for 4½ years, and who made the judgement that it was “uneconomic to investigate the transactions”?
  • Given that there are no detective controls, outside of the annual National Fraud Initiative (NFI) data matching exercise, to identify potential duplicate payments made and, more seriously, that the  Accounts Payable team have not been able to perform their own review of data to identify duplicate invoices submitted for payment, what is the risk that over the last 4½ years duplicate payments have been made but not investigated.
  • Why didn’t the Accounts Payable team disclose before this internal audit that they were unable to perform their own review of duplicate payments and why didn’t the Commissioning Group Finance identify this problem before now.
  • Please can you clarify the issue relating to the BACS payment run – is it that confirmation was received for the total amount being paid but not individual payments, or that there was no audit trail to evidence the preparation of the BACS report i.e. were the BACS payments correct in the first place?
  • Will ensuring all policies and procedures are uploaded to an appropriate shared drive so employees have remote access to all relevant documents ensure that staff in Sussex and Darlington actually read or familiarise themselves with the policies and procedures. What measure are in place to ensure this is more than just a box ticking exercise?
  • In the separate 19 page Internal Audit Report it highlights a high risk problem with the Cashbook Team. The sample of 25 unallocated receipts amounted to £559,000. What is the current total of all unallocated receipts?
  • Who is responsible for the Cashbook team, Capita or LBB.
  • If 19 of the 25 unallocated receipts were not investigated at all and 6 of the 25 were partially investigated but not followed up or resolved how many residents has been hassled unnecessarily or worse, have had the matter referred to a debt collection agency when the debt had been paid?
  • In the Outstanding actions section the highways actions have been deferred yet again. On point 1 why are Re taking so long to agree additional performance indicators proposed by the Council given that Re is supposed to be a JV between the Council and Capita?
  • On point 2 if the KPIs in question will only include the elements that Re can influence yet Re are the council’s agent for monitoring the LoHAC contract with Conway, how can we have any confidence that the LoHAC work will be delivered satisfactorily and that there is a rigid monitoring system in place?
  • Given that Capita have claimed and received a large gainshare payment for the “savings” on the LoHAC contract and that Re received a large payment from Barnet for advice on the LoHAC contract, surely they should accept responsibility for the delivery of that contract and the consequent KPIs.
  • On point 3, is requesting supporting information from the contractor the most appropriate way to validate performance if you already have concerns about the performance data provided by the contractor. Surely there should be a separate third party or Council validation process?
  • At Point 21 of the completed actions I note that “arrangements to streamline and make capturing and collation of DBS data more efficient will be implemented”. However, in light of the revelations identified in the recent Private Eye article where a Capita Director allegedly stated that “in the vast majority of cases the level of check could not be evidenced and in many cases was not correct”  and that such failures “will result in the DBS considering suspension or cancellation of our registration to use the DBS service”, please can you provide some reassurance that streamlining the capturing and collation of DBS data does not render the checks invalid?
Agenda item 8
  • The CAFT report highlights an on-going financial fraud investigation case. While I understand that you do not wish to discuss the specifics of this case, I am sufficiently alarmed by shortcomings under agenda item 7  that I believe it is important that any investigation into how the system failures permitted this fraud to take place must be addressed immediately to ensure that no further fraud can take place. Please can you confirm that the systemic faults that allowed this fraud have been identified and addressed already, that you will investigate how the systemic failure were allowed to exist in the first place and why Capita, the Commissioning Finance Team or internal audit did not identify the systemic risk sooner?
Agenda item 9
  • In light of the financial fraud investigation, do you think the additional allocation of 455 days for  blue badge investigations is appropriate and that instead the additional time should be allocated to identifying and stopping staff and financial fraud?
Agenda item 11
  • I note the audit plan recognises the additional powers and duties of the external auditor and, in particular, the point that these powers allow electors to raise questions about the accounts and consider objections. What it fails to address is the time taken to address these questions and objections. As such do you think it is acceptable that it has taken the Council 9 months to provide information to the external auditor in relation to an objection to the accounts and that the objection has still not been resolved.
  • I note that the external audit will bring in specialist support to review Use of Resources. Can you provide details of the particular areas they will be examining?


Thursday, 1 March 2018

Barnet Supplier Payments - Interim & Agency Spend Escalates

The supplier payments for January have been published. For the first month in a long time Capita are not in the top ten of payments. However, the interim and agency supplier Comensura billed more than £1.9 million.


In terms of Capita, they received a more modest £708,603 on both the CSG and Re contracts. However, we are still using up the advance payments balance as can be seen from the chart below.


In terms of the interim and agency bill there have been repeated  statements that they are getting these costs under control. Barnet spends a huge amount on agency staff and in addition Capita claims a very large amount under the gainshare clause. Last year we spend just under £20 million . This year, with two months still to run in the financial year, Barnet have already spent £14.8 million and it looks like they will hit just under £18 million by year end. That is still a vast amount of money to be spending on temporary staff and on which we pay 4 separate amounts of commission.


As always, I will  continue to monitor spending at Barnet.




Thursday, 22 February 2018

Is Barnet Capable of Managing its Outsourced Contracts?

Next Tuesday is the Performance and Contract Management Committee meeting. Reading the 119 page Performance Monitoring Report it makes my heart sink at how poorly some of the contracts are being monitored and managed and how performance management seems to be a box ticking exercise. You can read the report here at agenda item 7.

I have submitted a series of questions on a number of agenda items set out below. It will be interesting to see the responses.

  1. Can you explain why the Commissioning Group budget has risen from £20.2 m in 2016/17 to £35 million in 2017/18?
  2. On page 42 risk AC028 identifies the lack of a fully functioning case management system. Who is responsible for managing and maintaining this system and how confident are you that the draft plan to implement remedial works is actually working?
  3. On page 44 reference is made to Barnet’s Children’s Commissioner and her report of January 2018. At 4.23.3 of her report she made specific reference to the role of the PCM Committee, raising a question over whether that Committee has the capacity or capability to scrutinise and monitor complex children’s services effectively. Why was this not highlighted in the papers for this meeting and how are you going to actually address this serious concern?
  4. The Children’s Commissioner also noted that there is a culture in Barnet of over optimistic and over reassuring reporting to members. How confident are you that the reports you are receiving in these papers are not over optimistic and over reassuring and what steps are you taking to ensure that culture is changed?
  5. At page 94 there is a report regarding the performance of Cambridge Education. As part of this contract, school meals were subcontracted to ISS. School meals was a profit centre generating £240,000 of profit before it was outsourced and the business case identified it as a major source of additional income generated outside the borough to support the business case. Why is there no information on the financial performance of the ISS subcontract and will you provide an update of ISS’s current financial and operational performance?
  6. At page 97 it notes that there will be an additional charge for Revs & Bens work from DWP. In 2016/17 Capita charged £330,000 for additional Revs & Bens work plus £98,000 for face to face support. How much is Capita likely to charge in 2017/18?
  7. At page 99 the reports states that there is a rebate from Comensura and administration charges to other services, totalling £1.986m. Please can you clarify how this rebate from Comensura is calculated, and what proportion of the £1.986m it represents?
  8. One of the CSG contract variations identified in Table 12 is for £1,004,038 for dilapidations to NLBP Building 4 “to increase the funds to cover cost until October 2018”. Given that Barnet should have existed NLBP 4 in October 2015 why are we still paying into a dilapidations fund and why are we paying it to Capita, not the building freeholder?
  9. At Page 103 the report states we are paying £78,908.65 to Capita to assist with Family Services recruitment. Given that we paid Capita £248,000 for the same task last financial year are you sure this further payment represents value for money?
  10. At page 106 the report provides details on Re’s financial performance yet there is no mention of how much additional revenue they generated, a key component of the overall financial performance. Please can you tell me how Re are performing against revenue generation targets?
  11. To what extent has the contingency plan recognised that Capita provide services through a range of different service companies (for example pensions administration is operated through Capita Employee Benefits Limited) and that with such a complex operating structure some companies  might continue to trade while others are placed into some form of insolvency measure?
  12. To what extent has the contingency plan recognised issues such as retention of title, where for example if a Barnet contractor has purchased but not fully paid for essential equipment (such as IT hardware) the original supplier may uplift that equipment?
  13. To what extent has the contingency plan recognised that before a  company goes into some form of insolvency measure, it may experience a prolonged period where cashflow is highly restricted, preventing investment in key equipment and failing to replace staff that leave which would have a highly detrimental impact on service standards?
  14. Have you taken specific professional advice from an insolvency practitioner, for example from the external auditor BDO, to ensure the contingency plans are robust?
  15. At the Audit Committee of 31st January 2018 the Chair, Cllr Rayner, said that he was referring the issue of gainshare on the CSG contract back to this committee for a review. There is no mention of this in the forward work programme. When is it scheduled to take place?


Monday, 27 November 2017

So are we getting value for money from the outsourced Re Contract?

On Tuesday 28 November we have a  meeting which will discuss the review of  the Development and Regulatory Services contract with the Capita Joint Venture, Re.

I have read the report and the numerous appendices and it makes uncomfortable reading. Some services such as Trading Standards and Environmental Health are okay, others such as Highways and Planning are problematic.

Some of the statements which I find most worrying are as follows:

"The RE contract is a wide-ranging and complex commercial structure, which has created challenges regarding interpretation and understanding. The review has been particularly beneficial in terms of securing better awareness of this structure and thereby resolving a number of matters relating to interpretation and understanding of various elements of the contract."  What this says to me is that they didn't understand the contract when it was signed and even after 4 years of this contract being in operation they are only now coming to terms with interpretation of the contract which to my mind is unforgivable.

"There have been significant issues on highways service delivery, which is in part due to the complexity of the arrangements between RE, Conways and the Highways DLO." I have said repeatedly that the complex contractual relationship means that certain tasks fall between the gaps at the contractual boundaries and that is bad for residents.

"The Working Group concluded that:

  • Planning enforcement needs to be more responsive; 
  • Accessibility to planning applications needs to be improved, particularly on larger applications with high volumes of associated documents; 
  • Communication between planning and the public needs to be improved; 
  • There is a need to ensure that the consultation system is operating effectively (i.e. residents receive consultation letters in accordance with the policy); and 
  • The Planning Committee may wish to consider the policy in terms of the extent of consultation". 

Good recommendations but the fact that we are 4 years into this contract shows that the monitoring system has been inadequate to date. I blame all those professional consultants and lawyers who were paid millions to set up this contract but have so clearly failed to consider how it would be implemented.

"Capita’s internal organisational structure (known as “the towers”) has been identified as a layer of complexity that potentially impacts on day to day service delivery and a further exploration of this is recommended (report will include specific examples)"

Talk about "silo mentality" to anyone in business and they will tell you how destructive it can be for an organisation yet Capita seem to foster and promote this through their "Towers". Again this is something that should have been identified and addressed much earlier. The key risk now is that while it has been identified Barnet have no ability to influence how the much larger Capita organisation operate and as such they are likely to remain in place.

The Grant Thornton benchmarking report makes a telling comment when it says:
"Our benchmarking identified that a clearer understanding would be achieved if margins and costs were considered in relation to prices charged for service delivery".  In other words we don't know if we are being ripped off!

The killer for me is the statement below:

"In addition to the core contract, there is substantial expenditure on projects and the Review brief anticipated that the Review would pay some attention to this aspect. However, timelines have not permitted detailed reviews of individual projects, so the focus has been on value for money. Despite the use of external support, it has proved difficult to obtain sufficient information to conclude whether or not overall project costs represent good value for money and it is proposed that officers should explore this further".

Again, the issue of the cost of special projects is something I have been challenging for the last four years. I challenged on the CSG contract and it was brushed aside. Now they are saying they can't tell whether projects are value for money. In any other organisation any senior manager making such a statement would either be demoted or sacked. In Barnet they just accept it and say officers ought to  explore it further - pathetic!

There is no mention of a number of issues which I raised as part of my submission and which I know other people have concerns about such as the transparency of the contract and who in Re is responsible for each service. The Council has a large chart with names, emails and phone numbers for key senior council staff but not a single person within the Re or CSG contracts is included. That makes them faceless and it frustrates residents when they seem unable to get through to the people who can resolve problems and get things done. There is no mention of the financial performance of this contract. Given that it is overly dependent on raising money rather than making savings ,understanding how well it is performing is critical. The big risk is that in the absence of revenue generated from new business, Re simply put up prices to Barnet residents. The report notes that  Barnet had one of the highest set of  charges for pre planning advice of any of the comparator boroughs. We also have the highest charges for pest control and second highest for vehicle crossovers. So when Barnet say this contract is saving money remember we are generating those "savings" through the higher prices we are paying.

I have submitted a series of questions to the meeting which I have set out below. It will be interesting to see how they respond.
  1.       Appendix A says “The contract is on track to deliver significant savings to the council, in the order of £39m over the 10-year term”. However the external auditor stated in the audit completion report that there was an under performance of contracted income for the past two years totalling £4.599 million and that this was unbilled by Barnet. In addition, the Partnership Director from Capita said  that he "acknowledged the disputed £4.6 million" but that would be subject to debate. Are you sure this report is an accurate reflection of the true financial performance of this contract and why did this shortfall only come to light in the audit report.
  2. When the report says “in the order of £39 million” why is it so ambiguous. Is it more or less than £39 million and if less, by how much?
  3. What is “reasonable quality” and is reasonable good enough?
  4. A prepayment  of £16 million generating a discount is not a service improvement. Why has it been categorised as such?
  5. The report states that “the review has been particularly beneficial in terms of securing better awareness of this structure and thereby resolving a number of matters relating to interpretation and understanding of various elements of the contract”. If it has taken you 4 years to interpret and understand this contract is that a success or an admission of failure?
  6. Under regeneration, please can you clarify what are the “ongoing disagreements about what services are covered by the management fee”?
  7. In Appendix A the report states “it has proved difficult to obtain sufficient information to conclude whether or not overall project costs represent good value for money”. In particular the Impower report notes that there may be a benefit in looking at alternative suppliers of project resources especially firms like supplier D. Why has it taken 4 years to discover this.
  8. The reports states that “contractual commitments have been reviewed and the majority have been delivered” In my submission I identified 132 contractual commitment s and have not seen evidence that they have been delivered. Has this committee been provided with evidence that they have been delivered?
  9. In Appendix C the number of customer satisfaction responses in 2014/15 was 1101 but in 2016/17 was only 162. How confident are you that the data is representative given such a small sample size and why was a larger sample not sought?
  10. In Appendix D the levels of customer satisfaction  in 2015/16 fell by 10 percentage points compared to the previous year. The explanation of the 2016 figure implies people are unhappy because applications have been refused. Does this mean that the level of refusals is up on the previous year or is it simply an excuse for falling performance.
  11. In Appendix E the report notes that contractual commitment T3-100 has only been partially completed even though the commitment should have been completed by December 2013. Do you think a commitment that is 4 years overdue is acceptable?
  12.  In Appendix E the report notes that contractual commitment T3-110 has still not been completed even though the commitment should have been completed by September 2014. What service credit has been levied for this non compliance?
  13.  In Appendix E the report notes that contractual commitment T3-112 is not due. However the contract says this commitment was due 12 months after the contract was signed. Please can you clarify why this commitment has been incorrectly labelled as not due?
  14. In Appendix F the report notes that three contractual commitments T3-091, 097 & 098 are still not complete even though they should have been completed within 1 year of signing the contract. Why?
  15. Given that there is a clear disconnect between the service that was defined by the output specification and KPIs at the time and the council’s current requirements, does this mean that the service specification will be changed, will there be additional costs and does this exemplify the problems of trying to specify such a complex service over such a long contract period.






Tuesday, 26 September 2017

Gainshare, the contract clause that keeps on giving for Capita

Every three months the Council publishes the payments made to Capita.  I thought it might be useful to shine a bit more light on one of those payments, gainshare, the £8.3 million bonus that has been paid to Capita so far.


When Barnet Council agreed the massive Customer and Support Group (CSG) contract in December 2012, many people expressed concern at the lack of transparency in the process and what had actually been agreed. Once the contract was signed in August 2013 and after much badgering we eventually got to see chunks of the contract. Buried away in the thousands of pages was something called Gainshare. In the contract this is defined as follows:

"Gainshare means a distribution of benefits between the Authority and Service Provider in
relation to a benefit calculated by reference to the relevant provision within Schedule 4
(Payment and Performance Mechanism), or business case developed under the
provisions of Schedule 15 (Special Projects Approval Procedure)"

In plain English what it means is that if Capita make a savings on a project, exceed an agreed target or negotiate a better purchasing deal they get a share of those savings. On the face of it that seems reasonable but as always the devil is in the detail. The contract included specific guarantees of savings and my original thought was that gainshare would only be payable on the savings over and above those guarantees but that is not the case. This means, for example, that Capita were able to claim £5.9 million of gainshare payments on procurement savings while Barnet received just £1.36 million above the guarantee. That doesn't look like a fair share to me.

I have always had concerns about this clause as it seems to offer some very open ended incentives. As I feel it is important to hold Capita to account given how much we are paying them, I inspected the accounts this summer to understand if these are valid payments. It was quite revealing. In addition to savings on reduction in the numbers claiming single persons discount on council tax,  Capita have claimed gainshare payments on savings made on a range of other services including:
  • Domestic Violence Services;
  • Children and Adolescent Mental Health Services;
  • Mental Health Assessors;
  • Return Home Interviews;
  • Independent Social Workers;
  • Stroke Services;
  • Independent Advice and Advocacy Services.
Now to be fair, council staff disputed the savings made on Domestic Violence Services and Return Home Interviews and subsequently Capita had to issue credit notes for those payments but the fact that they were paid in the first place is very worrying. 

If you can save some money by buying a standard commodity product, like a laptop computer, somewhere cheaper then I am sure most people wouldn't argue with that so long as it is the same computer. When you start looking at services for the vulnerable there is a real risk that the savings have a direct impact on the service offered. The problem is the contract is heavily incentivised to make these savings and that may prompt actions which are undesirable and risk reducing the quality of service.

The lion's share of the gainshare payments have been paid on the Comensura contract who supply all the council's agency and interim staff.(£1.26 million), London Highways Alliance Contract which provides road repairs (£500k) and saving on gas and electricity (£313k). To be clear, this is not the total saving but merely what is paid to Capita. It is also important to note that the payment is not made against savings actually achieved. It is invoiced up front on forecast savings and at the end of the period they have a "true up" which compares the savings claimed up front against the actual and either further payment is made or a credit issued by Capita.

Looking at the example of the Gas and Electricity savings you can read the basis for Capita's claim here. Capita have claimed a saving of £942,000 made up of  actual annual energy savings of £111,071 plus £202,420 of "corrected overcharges". They then gross up the three years of potential savings and send Barnet a bill for £313,000 as their share of the savings. To my mind this is a serious manipulation of the actual savings that could be justified given that if a procurement department was doing their job properly overcharges would get picked up in the normal day to day review of invoices. I am so concerned about this claim that I have raised it with the external auditor and I await his response.

Normally this whole gainshare process is entirely opaque but as I remain concerned about how much is being paid on this clause I make sure I examine the details. Some people will say that it shouldn't matter as it is better to get 66% of something than 100% of nothing but if we had a well resourced council run procurement department then all that saving would be retained. Just think what the £8.3 million could mean if that was coming back to Barnet instead of supporting Capita shareholders.

Perhaps Richard Cornelius will be able to explain this to me at one of his "Question Time With The Leader" meetings coming up in the next few weeks. You can book your place here